Urumqi Economic and Technological Development Zone (Toutunhe District) North Station Road
Sector: Airport • Location: China
Source: World Bank Group
The project involves the investment, financing, construction, operation and maintenance of Urumqi Economic and Technological Development Zone (Toutunhe District) North Station Road (Bagang Road-Airport Expressway) in located in Urumqi Economic and Technological Economic Development Zone (Toutunhe District), Urumqi, Xinjiang, China. The projects consists of construction of about 11.3 KM two-way 8 l
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the investment, financing, construction, operation and maintenance of Urumqi Economic and Technological Development Zone (Toutunhe District) North Station Road (Bagang Road-Airport Expressway) in located in Urumqi Economic and Technological Economic Development Zone (Toutunhe District), Urumqi, Xinjiang, China. The projects consists of construction of about 11.3 KM two-way 8 lanes road. The SPV is called Urumqi Xinxiang Construction Babei Project Investment Management Co., Ltd and owned by Hunan Construction Engineering Group Co., Ltd. with a 95% stake and state-owned Urumqi Economic and Technological Development Zone Construction Investment Development Co., Ltd. with 5% stake. The project cost amounts to CNY 36.22 mllion or $ 5.1 million. The project is structured under BOT model for a period of 25 years (of which the construction period is 3 years and the operation period is 22 years). The return mechanism is feasibility gap subsidy and user fees. Financial close was reached on 30 September 2019. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
