logo

US 101/ SR 92 Short-Term Interchange Improvements Project

Sector: Government • Location: San Mateo County, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Ongoing

San Mateo County Transportation Authority (SMCTA) and City / County Association of Governments (C-CAG) of San Mateo County, in 2018 conducted a Preliminary Planning Study (PPS) to address the congestion and safety concerns in the vicinity of the US101 / SR 92 interchange. Short-Term and Long-Term alternatives were identified during the PPS. This project carries forward the Short-Term area improvem

Project Information FAQ

Project Information

4 Q
The project “US 101/ SR 92 Short-Term Interchange Improvements Project” is an infrastructure initiative in the Government sector, located in San Mateo County, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

San Mateo County Transportation Authority (SMCTA) and City / County Association of Governments (C-CAG) of San Mateo County, in 2018 conducted a Preliminary Planning Study (PPS) to address the congestion and safety concerns in the vicinity of the US101 / SR 92 interchange. Short-Term and Long-Term alternatives were identified during the PPS. This project carries forward the Short-Term area improvements, which focus on addressing existing deficiencies, and are non-complex improvements with relatively low implementation costs, and no right of way acquisition is anticipated since the improvements can be constructed within the existing right of way.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data