US 11 SIGNAL OPTIMIZATION
Future development · New York
Source: New York State Department of Transportation (NYSDOT)
The project will install signal optimization/traffic flow improvement measures (such as, but not limited to advanced detection with a hybrid video/radar approach) along the US Rt 11 corridor between the NYS Rte. 342 intersection and the I-781 intersection. The projects benefits include real time congestion monitoring that intends to decrease delays, travel time, and congestion in both the main lin
- Status
- Prospective
- Sector
- Road
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- New York State Department of Transportation (NYSDOT)
ConstructChat
Ask ConstructChat about US 11 SIGNAL OPTIMIZATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | future development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will install signal optimization/traffic flow improvement measures (such as, but not limited to advanced detection with a hybrid video/radar approach) along the US Rt 11 corridor between the NYS Rte. 342 intersection and the I-781 intersection. The projects benefits include real time congestion monitoring that intends to decrease delays, travel time, and congestion in both the main line and side streets to improve air quality. |
Location
Country | United States of America (USA) |
State | New York |
Source
Source | New York State Department of Transportation (NYSDOT) |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
