logo

US-12 Utility Extension

Sector: Water Supply and Storage • Location: New Buffalo, Michigan, United States of America

Source: Dodge USA

Project
Closed

Scope - This project consists of extending 8 inch water main along both the south and north sides of US-12 between I-94 and Hoder Road. Included in the water main construction is crossing US-12 twice via trenchless installation. The project also includes the installation of a low pressure sewer system along US-12 between I-94 and Hoder Road consisting of a 2 inch force main. Restoration and variou

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Power Generation (CCGT)
Location
New Buffalo, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about US-12 Utility Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “US-12 Utility Extension” is an infrastructure initiative in the Water Supply and Storage sector, located in New Buffalo, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - This project consists of extending 8 inch water main along both the south and north sides of US-12 between I-94 and Hoder Road. Included in the water main construction is crossing US-12 twice via trenchless installation. The project also includes the installation of a low pressure sewer system along US-12 between I-94 and Hoder Road consisting of a 2 inch force main. Restoration and various appurtenances is included.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

New Buffalo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Power Generation (CCGT)

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project