US 150/Illinois 78 Resurfacing Project
Sector: Transportation • Location: Brimfield and Laura, Illinois, United States
Source: Galesburg Register Mail
A section of U.S. 150/Illinois 78 will be reduced to one lane for resurfacing work including median work, patching, milling, and resurfacing. The project stretches from the Interstate 74 exit ramp to U.S. 150 in Brimfield and Laura. Traffic will be controlled by flaggers during the project, which is expected to be completed by mid-July.
- Status
- Under Construction
- Sector
- Transportation
- Location
- Brimfield and Laura, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Galesburg Register Mail
ConstructChat
Ask ConstructChat about US 150/Illinois 78 Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A section of U.S. 150/Illinois 78 will be reduced to one lane for resurfacing work including median work, patching, milling, and resurfacing. The project stretches from the Interstate 74 exit ramp to U.S. 150 in Brimfield and Laura. Traffic will be controlled by flaggers during the project, which is expected to be completed by mid-July. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Illinois |
City | Brimfield and Laura |
Source
Source | Galesburg Register Mail |
URL |
More Details
Record type | Project |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
