US 183 South / Bergstrom Expressway
Sector: Airport • Location: Texas, United States of America
Source: Federal Highway Administration (FHWA)
The US 183 South / Bergstrom Expressway project will be an 8-mile highway and express toll facility in Austin, Texas, connecting US 290 and SH 71. The project will expand the capacity of existing US 183, a north-south arterial serving more than 60,000 vehicles per day as an alternative to the heavily congested I-35 to the west. US 183 provides a route for commuters from several cities to Downtown
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The US 183 South / Bergstrom Expressway project will be an 8-mile highway and express toll facility in Austin, Texas, connecting US 290 and SH 71. The project will expand the capacity of existing US 183, a north-south arterial serving more than 60,000 vehicles per day as an alternative to the heavily congested I-35 to the west. US 183 provides a route for commuters from several cities to Downtown Austin and is one of three highways providing access to Austin-Bergstrom International Airport. In its current configuration, with numerous at-grade intersections, US 183's mobility and operational benefits are limited and could be maximized by a more complete roadway network. The project consists of six tolled main lanes in the median of US 183, four to six upgraded general purpose lanes, five grade-separated interchanges, four new bridges, two new tolled direct connect flyover ramps at SH 71, and the installation of intelligent traffic management systems. The project also includes bike lanes, pedestrian sidewalks, and shared-use paths. The project will be constructed in two phases. Phase 1 between US 290 and Bolm Road is expected to be completed in late 2019, and Phase 2 continuing from Bolm Road to SH 71 about one year later. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
