US 19 New Interchanges and Roadway Improvements
Sector: Bridge • Location: Clearwater Dunedin Palm Harbor, Florida, United States of America (USA)
Source: Florida Department of Transportation (FDOT)
The interchange and roadway improvement project is modifying the existing six-lane divided highway to a six-lane controlled access roadway with one-way frontage roads in both directions parallel to US 19 from SR 580 (Main Street) to the north of CR 95/CR 39 in Pinellas County. In addition, new interchanges will be added just north of Boy Scout Road and at SR 586 (Curlew Road) to improve traffic fl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The interchange and roadway improvement project is modifying the existing six-lane divided highway to a six-lane controlled access roadway with one-way frontage roads in both directions parallel to US 19 from SR 580 (Main Street) to the north of CR 95/CR 39 in Pinellas County. In addition, new interchanges will be added just north of Boy Scout Road and at SR 586 (Curlew Road) to improve traffic flow along this corridor. A pedestrian underpass will be added between Evans Road and Republic Drive and a pedestrian bridge over US 19 is being constructed at Northside Drive. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America (USA)
- US 77 Victoria
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- I-45 from the Galveston Causeway Bridge to 61st Street
- Yale Street Bridge
- SH 146 from FM 519 to Loop 197
- US 59 from CR 227 to Spur 10
- I-45 (FM 1764 to Galveston Causeway)
- FM 45 from the Mills County Line to Richland Springs North City Limit in San Saba County
