U.S. 19 Repaving and Improvements Project
The owner, status and timeline of this project. A free account opens every field.
Source: City of Clearwater
The Florida Department of Transportation is working on U.S. 19 in Clearwater between Drew Street and Sunset Point Road. The project includes repaving U.S. 19, ramps, and frontage roads, realigning existing U-turn lanes, and upgrading sidewalks and lighting. Construction is anticipated to be complete in Summer 2026.
- Status
- Under Construction
- Sector
- Government, Road
- Location
- Clearwater, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Clearwater
ConstructChat
Ask ConstructChat about U.S. 19 Repaving and Improvements Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Florida Department of Transportation is working on U.S. 19 in Clearwater between Drew Street and Sunset Point Road. The project includes repaving U.S. 19, ramps, and frontage roads, realigning existing U-turn lanes, and upgrading sidewalks and lighting. Construction is anticipated to be complete in Summer 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Florida |
City | Clearwater |
Source
Source | City of Clearwater |
URL |
More Details
Record type | Project |
Sector | Government, Road |
Article published date | 2026-04-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
