US 2 - 6th Ave Craig Rd Use Path
Sector: Solar • Location: Airway Heights, Washington, United States of America
Source: Dodge USA
The project generally consists of the construction of earth moving, shared-path construction including grading, asphalt paving, ADA ramps, and other work along Craig Road from US-2 to 6th Avenue. This Contract provides for shared-use path in Spokane County in the City of Airway Heights from US-2 to 6th Avenue by grading, paving with HMA, drainage, ADA features, signing, solar rectangular rapid fla
- Status
- Closed
- Sector
- Solar, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Automotive, Rail, Government, Commercial
- Location
- Airway Heights, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about US 2 - 6th Ave Craig Rd Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of the construction of earth moving, shared-path construction including grading, asphalt paving, ADA ramps, and other work along Craig Road from US-2 to 6th Avenue. This Contract provides for shared-use path in Spokane County in the City of Airway Heights from US-2 to 6th Avenue by grading, paving with HMA, drainage, ADA features, signing, solar rectangular rapid flashing beacons (solar), temporary traffic control and other work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Airway Heights |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Automotive, Rail, Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
