US-20 Buffalo River Bridge Improvement
Sector: Bridge • Location: Island Park, Idaho, United States
Source: Idaho Transportation Department (.gov)
Construction work to stabilize the soil where the US-20 Buffalo River Bridge meets the roadway and repave the approaches to create a smoother ride and preserve the longevity of US-20 in Island Park. Traffic will be reduced to one lane in each direction during construction.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction work to stabilize the soil where the US-20 Buffalo River Bridge meets the roadway and repave the approaches to create a smoother ride and preserve the longevity of US-20 in Island Park. Traffic will be reduced to one lane in each direction during construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
