logo

US-23 Bascule Bridge Reopening

Sector: Water Supply and Storage • Location: Cheboygan, Michigan, United States

Source: State of Michigan

Project
Reopened

The US-23 bascule bridge in Cheboygan, Michigan, was raised on April 12 to protect against potential damage from debris and ensure safety. Following inspections and scans that identified no erosion concerns, the Michigan Department of Transportation (MDOT) lowered the bridge and reopened it to roadway traffic at 7 a.m. on April 25, 2026. MDOT engineers will continue to monitor water levels and con

Status
Under Construction
Sector
Water Supply and Storage, Hydro, Bridge
Location
Cheboygan, Michigan, United States of America
Updated
22 Jul 2026
Source
State of Michigan

ConstructChat

Ask ConstructChat about US-23 Bascule Bridge Reopening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “US-23 Bascule Bridge Reopening” is an infrastructure initiative in the Water Supply and Storage sector, located in Cheboygan, Michigan, United States. Taiyo aggregates data on it from State of Michigan.

Participants

Not available for this record.

Status

Original status

reopened

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The US-23 bascule bridge in Cheboygan, Michigan, was raised on April 12 to protect against potential damage from debris and ensure safety. Following inspections and scans that identified no erosion concerns, the Michigan Department of Transportation (MDOT) lowered the bridge and reopened it to roadway traffic at 7 a.m. on April 25, 2026. MDOT engineers will continue to monitor water levels and conditions at the nearby Cheboygan Lock and Dam Complex.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Michigan

City

Cheboygan

Source

Source

State of Michigan

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Bridge

Article published date

2026-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project