US 278 Resurfacing
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge
The project, located in Beaufort County, shall consist of milling and paving US 278 from Okatie River Bridge (approx. mile point 2.84) to Hampton Pkwy (3.06). The work shall include, but is not limited to, traffic control, asphalt milling, asphalt paving, striping and traffic signal loop replacement.
- Status
- Closed
- Sector
- Government, Bridge, Commercial, Road, Manufacturing (Industrial)
- Location
- Beaufort, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about US 278 Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project, located in Beaufort County, shall consist of milling and paving US 278 from Okatie River Bridge (approx. mile point 2.84) to Hampton Pkwy (3.06). The work shall include, but is not limited to, traffic control, asphalt milling, asphalt paving, striping and traffic signal loop replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Beaufort |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Commercial, Road, Manufacturing (Industrial) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
