US 290 improvement project - FM 1155 intersection study (Chappell Hill)
Sector: Road • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
TxDOT is developing a US 290 improvement project from FM 1371 in Washington County to State Highway 6 in Waller County, a total of approximately 12 miles. The proposed project would widen the existing four-lane divided highway to a six-lane divided highway with a grass median and required drainage infrastructure. The purpose of the proposed widening project is to improve mobility and enhance safet
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | TxDOT is developing a US 290 improvement project from FM 1371 in Washington County to State Highway 6 in Waller County, a total of approximately 12 miles. The proposed project would widen the existing four-lane divided highway to a six-lane divided highway with a grass median and required drainage infrastructure. The purpose of the proposed widening project is to improve mobility and enhance safety within the project corridor. The project is currently unfunded and construction is not currently anticipated to begin before 2030, unless funding is identified. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
