US 290 Toll Road Project
Sector: Road • Location: Austin, Texas, United States
Source: Stock Titan
The US 290 toll road project is a 6-mile corridor from US 183 to SH 130 in East Austin, which has been upgraded to an expressway facility, tripling the existing roadway's capacity and improving travel times. It features integrated direct connectors at US 183 and SH 130, and is part of a fully automated tolling system.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The US 290 toll road project is a 6-mile corridor from US 183 to SH 130 in East Austin, which has been upgraded to an expressway facility, tripling the existing roadway's capacity and improving travel times. It features integrated direct connectors at US 183 and SH 130, and is part of a fully automated tolling system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
