logo
ProjectUnder Construction

U.S. 30 Bridge Deck Replacement

Under construction · Iowa · Last reported Mar 2025

Source: Western Iowa Today 96.5 KSOM KS 95.7

The project involves the replacement of the bridge deck on the U.S. 30 bridge over the Boyer River, located near Dow City in Crawford County. The work is scheduled to begin on March 31 and is expected to last until late September, weather permitting.

Status
Under Construction
Sector
Bridge
Location
Dow City, Iowa, United States of America
Updated
22 Jul 2026
Source
Western Iowa Today 96.5 KSOM KS 95.7

ConstructChat

Ask ConstructChat about U.S. 30 Bridge Deck Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “U.S. 30 Bridge Deck Replacement” is an infrastructure initiative in the Bridge sector, located in Dow City, Iowa, United States. Taiyo aggregates data on it from Western Iowa Today 96.5 KSOM KS 95.7.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the bridge deck on the U.S. 30 bridge over the Boyer River, located near Dow City in Crawford County. The work is scheduled to begin on March 31 and is expected to last until late September, weather permitting.

Location

Country

United States of America (USA)

State

Iowa

City

Dow City

Source

Source

Western Iowa Today 96.5 KSOM KS 95.7

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2025-03-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project