US 301 Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project consists of improving US 301 by providing a third through lane north and south bound between MD 214 and MD 4 to accommodate lanetransition; and further widening, as needed, at Trade Zone Avenue, MD 214 and MD 725. Associated intersection improvements at Old Central Avenue, Trade Zone Avenue, Leeland Road and Village Drive West also will be undertaken.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Road, Government
- Location
- Edgewater, Maryland, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about US 301 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project consists of improving US 301 by providing a third through lane north and south bound between MD 214 and MD 4 to accommodate lanetransition; and further widening, as needed, at Trade Zone Avenue, MD 214 and MD 725. Associated intersection improvements at Old Central Avenue, Trade Zone Avenue, Leeland Road and Village Drive West also will be undertaken. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Edgewater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Road, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
