logo

U.S. 36 Managed Lane / Bus Rapid Transit Project: Phase 1

Sector: Mass Transit • Location: Colorado, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

U.S. 36 is a four-lane divided highway that connects the City of Boulder to Denver at its intersection with I-25. The highway currently experiences significant congestion and has been targeted for improvements by the Colorado Department of Transportation (CDOT) since the late 1990s. The U.S. 36 Managed Lane Project Phase I is an initial 10-mile phase of improvements along 16 miles of roadway betwe

Project Information FAQ

Project Information

5 Q
The project “U.S. 36 Managed Lane / Bus Rapid Transit Project: Phase 1” is an infrastructure initiative in the Mass Transit sector, located in Colorado, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

U.S. 36 is a four-lane divided highway that connects the City of Boulder to Denver at its intersection with I-25. The highway currently experiences significant congestion and has been targeted for improvements by the Colorado Department of Transportation (CDOT) since the late 1990s. The U.S. 36 Managed Lane Project Phase I is an initial 10-mile phase of improvements along 16 miles of roadway between the two cities. The project will include one express, high occupancy toll (HOT) lane in each direction from Federal Boulevard to 88th Street in Louisville/Superior (approximately 10 miles) and reconstruction of the general purpose lanes.  Additionally, it includes the replacement of the Wadsworth Parkway, Wadsworth Boulevard, Lowell Boulevard, and Sheridan Boulevard bridges, and replacement of the US 36 bridge over the BNSF Railway.  Additionally, there are improvements to Regional Transportation District (RTD) stations along the corridor. The US 36 Managed Lane and Bus Rapid Transit Project will ameliorate significant safety hazards that existed before the project’s inception, such as:  structurally deficient bridges, harsh grading, and insufficient stopping sight distances. Upon completion, these improvements are expected to significantly reduce accident rates. The project will implement an intelligent transportation system for electronic tolling and electronic display of transit information. Together, improved conditions and upgraded technology will generate significant time savings with each transit rider, carpooler, and toll-paying driver expected to save up to 25 minutes in travel time savings between Denver and Boulder. The project created approximately 4,400 jobs. TIFIA financing allowed for the realization of the stated benefits at least 20 years earlier and at a cost savings of approximately $200 million when compared to conventional financing methods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data