logo

U.S. 36 Managed Lane / Bus Rapid Transit Project: Phase 2

Sector: Road • Location: Colorado, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

U.S. 36 is a four-lane divided highway that connects the City of Boulder to Denver at its intersection with I-25. The U.S. 36 Managed Lane Project Phase II is a 5.1 mile segment from 88th Street in Louisville/Superior, Colorado to the Table Mesa/ Foothills Parkway in Boulder, Colorado. Phase I and Phase II of the project will connect to the northern terminus of the I-25 Express Toll Lanes.  Phase

Project Information FAQ

Project Information

5 Q
The project “U.S. 36 Managed Lane / Bus Rapid Transit Project: Phase 2” is an infrastructure initiative in the Road sector, located in Colorado, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

U.S. 36 is a four-lane divided highway that connects the City of Boulder to Denver at its intersection with I-25. The U.S. 36 Managed Lane Project Phase II is a 5.1 mile segment from 88th Street in Louisville/Superior, Colorado to the Table Mesa/ Foothills Parkway in Boulder, Colorado. Phase I and Phase II of the project will connect to the northern terminus of the I-25 Express Toll Lanes.  Phase II is being delivered under a design-bid-build contract: Addition of an express lane in each direction of the U.S. 36 for the Bus Rapid Transit (BRT), High Occupancy Vehicles (HOV) and tolled Single Occupancy Vehicles (SOV) Pavement reconstruction and BRT signage and bus ramp improvements Installation of Intelligent Transportation Systems (ITS) Improve Regional Transportation District (RTD) stations Installation of commuter bike lanes The US 36 Managed Lane and Bus Rapid Transit Project will ameliorate significant safety hazards that existed before the project’s inception, such as:  structurally deficient bridges, harsh grading, and insufficient stopping sight distances. Upon completion, these improvements are expected to significantly reduce accident rates. The project will implement an intelligent transportation system for electronic tolling and electronic display of transit information. Together, improved conditions and upgraded technology will generate significant time savings with each transit rider, carpooler, and toll-paying drivers are expected to save up to 25 minutes in travel time savings between Denver and Boulder. The project created approximately 4,400 jobs. TIFIA financing allowed for the realization of the stated benefits at least 20 years earlier and at a cost savings of nearly $200 million compared to conventional financing methods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data