logo

US 41 (SR 45) from Caribbean Drive to SR 72 (Stickney Point Road)

Sector: Car parking • Location: Florida, United States of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Closed

The Florida Department of Transportation (FDOT), District One, is designing improvements on US 41 from Caribbean Drive to SR 72 (Stickney Point Road) in Sarasota County. The proposed design includes resurfacing of the road to provide 6-foot-wide shoulders that will be utilized as 6-foot-wide buffered bike lanes, and the widening of the right-turn lanes to accommodate the new bike lanes. It will al

Project Information FAQ

Project Information

5 Q
The project “US 41 (SR 45) from Caribbean Drive to SR 72 (Stickney Point Road)” is an infrastructure initiative in the Car parking sector, located in Florida, United States of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation (FDOT), District One, is designing improvements on US 41 from Caribbean Drive to SR 72 (Stickney Point Road) in Sarasota County. The proposed design includes resurfacing of the road to provide 6-foot-wide shoulders that will be utilized as 6-foot-wide buffered bike lanes, and the widening of the right-turn lanes to accommodate the new bike lanes. It will also construct 6-foot-wide sidewalks on both sides of the highway to improve safety for multimodal transportation on this corridor. Modification of pedestrian sidewalk ramps will take place throughout the project to meet Americans with Disabilities Act (ADA) guidelines, and driveways will be modified as needed to accommodate the new sidewalks and to bring them up to current design standards. FDOT will also construct transit shelter pads and boarding pads along the corridor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data