US 45 (New London to Clintonville)
Sector: Road • Location: New London, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The asphalt pavement on this section of US 45 and ramps on and off WIS 54 are showing signs of deterioration. If not improved, accelerated deterioration of the highway will occur and maintenance costs will continue to rise. There are 16 culvert pipes that are deteriorated and in need of improvement. The culvert pipes need to be cleaned and repairs are required for the inlets. The culvert pipes are
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The asphalt pavement on this section of US 45 and ramps on and off WIS 54 are showing signs of deterioration. If not improved, accelerated deterioration of the highway will occur and maintenance costs will continue to rise. There are 16 culvert pipes that are deteriorated and in need of improvement. The culvert pipes need to be cleaned and repairs are required for the inlets. The culvert pipes are at or near the end of their useful service life. A Park and Ride parking lot is in need of resurfacing to maximize the life of the pavement structure. The project will be a full pavement depth removal, with paving 7-7.5 inches of new asphalt, keeping the current 12-foot lanes, 3-foot paved shoulders, and 7-foot gravel shoulders. Additional work will include the cleaning and repair of inlets on the 16 culvert pipes, spot curb and gutter repairs, guardrail replacement, centerline rumble strips, restriping and pavement markings on the new asphalt pavement. The park and ride at WIS 15 will be milled and overlaid. The project is anticipated to be constructed with the WIS 54, New London-Black Creek, West Jeanne Street to County S project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
