US 52 - STATE LINE TO E JCT ND 5
One of 10,000+ projects Taiyo tracks in United States.
Road Widening Work. Passing Lane Construction between mile marker 4.3 to 31.8. Shoulder work occurring. Travel speed not reduced. Be cautious when driving through passing lane locations as work is occurring off the shoulder of the road.. No Lane Closure
- Status
- Prospective
- Sector
- Road
- Location
- United States of America
- Updated
- 19 Nov 2026
- Source
- North Dakota Department of Transportation
ConstructChat
Ask ConstructChat about US 52 - STATE LINE TO E JCT ND 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Road Widening Work. Passing Lane Construction between mile marker 4.3 to 31.8. Shoulder work occurring. Travel speed not reduced. Be cautious when driving through passing lane locations as work is occurring off the shoulder of the road.. No Lane Closure |
Original sector | Transport |
Location
Country | United States of America (USA) |
Source
Source | North Dakota Department of Transportation |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
