US-52/IL 64 Over the Mississippi River Project
Sector: Bridge • Location: Savanna, Illinois, United States of America
Source: Illinois Department of Transportation (IDOT)
The Illinois Department of Transportation (IDOT) has undertaken the U.S. 52/IL 64 over the Mississippi River Study. IDOT is the lead agency with input being provided by The Iowa Department of Transportation (IADOT). This study is examining transportation needs and solutions for the replacement of the existing bridge that carries U
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Illinois Department of Transportation (IDOT) has undertaken the U.S. 52/IL 64 over the Mississippi River Study. IDOT is the lead agency with input being provided by The Iowa Department of Transportation (IADOT). This study is examining transportation needs and solutions for the replacement of the existing bridge that carries U |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |