US 59 Feasibility Study
Sector: Road • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
TxDOT is conducting a feasibility study of interstate designation for US 59 from Bob Bullock Loop to 20.7 miles east of Bob Bullock Loop. The eastern project study limit on US 59 is located approximately 7.5 miles west of FM 2895 in Webb County, Texas. In addition, TxDOT is analyzing potential concepts (or routes) aimed at improving safety, mobility, and capacity in the study area.
- Sector
- Road, Government, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TxDOT)
ConstructChat
Ask ConstructChat about US 59 Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TxDOT is conducting a feasibility study of interstate designation for US 59 from Bob Bullock Loop to 20.7 miles east of Bob Bullock Loop. The eastern project study limit on US 59 is located approximately 7.5 miles west of FM 2895 in Webb County, Texas. In addition, TxDOT is analyzing potential concepts (or routes) aimed at improving safety, mobility, and capacity in the study area. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Texas Department of Transportation (TxDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Manufacturing (Industrial) |
Article published date | 2023-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
