logo

US 59 from CR 227 to Spur 10

Sector: Bridge • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project

The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections

Project Information FAQ

Project Information

3 Q
The project “US 59 from CR 227 to Spur 10” is an infrastructure initiative in the Bridge sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections (elevated intersections) at FM 2919/Lum Road, FM 360, Isleib Road and Spur 10 Discontinuous two-way frontage roads Proposed improvements Construct an additional lane in each direction Widen mainlanes to 12 feet with 12-foot-wide shoulders Convert two-way frontage roads to one-way operation Widen frontage road lanes to 12 feet with 6-foot-wide inside, and 6-foot to 10-foot-wide outside shoulders Eliminate crossover intersections at Darst Road, Grunwald Road and Daily Road Grade separations (elevated intersections) have already been constructed at Farm-to-Market (FM) 2919/Lum Road, FM 360, Isleib Road and Spur 10) Provide safe bicycle and pedestrian crossings through a 14-foot-wide outside curb lane along signalized intersections at FM 2919/Lum Road, FM 360 and Isleib Road Provide a continuous roadway between intersections, transitioning back to four-lanes east of the San Bernard River Bridge This project is expected to improve safety, mobility and meet interstate standards. The project would require approximately 2.69 acres of additional right of way in two locations on the north side of US 59 between Isleib Road and Loop 540 (Spur 540). No displacements are required. Partners This study is a partnership between TxDOT and the Federal Highway Administration.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data