logo

US 59 from CR 227 to Spur 10

Sector: Bridge • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project

The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections

Sector
Bridge, Raw Materials, Road, Government, Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Texas Department of Transportation (TxDOT)

ConstructChat

Ask ConstructChat about US 59 from CR 227 to Spur 10

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “US 59 from CR 227 to Spur 10” is an infrastructure initiative in the Bridge sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections (elevated intersections) at FM 2919/Lum Road, FM 360, Isleib Road and Spur 10 Discontinuous two-way frontage roads Proposed improvements Construct an additional lane in each direction Widen mainlanes to 12 feet with 12-foot-wide shoulders Convert two-way frontage roads to one-way operation Widen frontage road lanes to 12 feet with 6-foot-wide inside, and 6-foot to 10-foot-wide outside shoulders Eliminate crossover intersections at Darst Road, Grunwald Road and Daily Road Grade separations (elevated intersections) have already been constructed at Farm-to-Market (FM) 2919/Lum Road, FM 360, Isleib Road and Spur 10) Provide safe bicycle and pedestrian crossings through a 14-foot-wide outside curb lane along signalized intersections at FM 2919/Lum Road, FM 360 and Isleib Road Provide a continuous roadway between intersections, transitioning back to four-lanes east of the San Bernard River Bridge This project is expected to improve safety, mobility and meet interstate standards. The project would require approximately 2.69 acres of additional right of way in two locations on the north side of US 59 between Isleib Road and Loop 540 (Spur 540). No displacements are required. Partners This study is a partnership between TxDOT and the Federal Highway Administration.

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Texas Department of Transportation (TxDOT)

URL

More Details

Record type

Project

Sector

Bridge, Raw Materials, Road, Government, Manufacturing (Industrial)

Article published date

2023-11-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project