US 59 from CR 227 to Spur 10
Sector: Bridge • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The TxDOT Houston District, in cooperation with the City of Houston, proposes to improve an approximately 10.5-mile-long, four-lane section of US 59 from County Road (CR) 227 (Tom Taylor Road) to Spur 10 (Patton Road/SH 36 Bypass). Current conditions Four-lane divided highway At-grade (roadway level) intersections at CR 227, Ora Lee Road, Grunwald Road and Daily Road Grade-separated intersections (elevated intersections) at FM 2919/Lum Road, FM 360, Isleib Road and Spur 10 Discontinuous two-way frontage roads Proposed improvements Construct an additional lane in each direction Widen mainlanes to 12 feet with 12-foot-wide shoulders Convert two-way frontage roads to one-way operation Widen frontage road lanes to 12 feet with 6-foot-wide inside, and 6-foot to 10-foot-wide outside shoulders Eliminate crossover intersections at Darst Road, Grunwald Road and Daily Road Grade separations (elevated intersections) have already been constructed at Farm-to-Market (FM) 2919/Lum Road, FM 360, Isleib Road and Spur 10) Provide safe bicycle and pedestrian crossings through a 14-foot-wide outside curb lane along signalized intersections at FM 2919/Lum Road, FM 360 and Isleib Road Provide a continuous roadway between intersections, transitioning back to four-lanes east of the San Bernard River Bridge This project is expected to improve safety, mobility and meet interstate standards. The project would require approximately 2.69 acres of additional right of way in two locations on the north side of US 59 between Isleib Road and Loop 540 (Spur 540). No displacements are required. Partners This study is a partnership between TxDOT and the Federal Highway Administration. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
