US 59 upgrade Redland - future I-69
Sector: Raw Materials • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
This project is dedicated to improving mobility and providing system connectivity along US 59 between State Loop (SL) 287 and Farm to Market (FM) 2021 in Redland. The proposed project would involve the construction of frontage roads and reconstruction of the US 59 main lanes to meet interstate standards for potential future designation as I-69. The Lufkin District hosted an open house on June 27,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is dedicated to improving mobility and providing system connectivity along US 59 between State Loop (SL) 287 and Farm to Market (FM) 2021 in Redland. The proposed project would involve the construction of frontage roads and reconstruction of the US 59 main lanes to meet interstate standards for potential future designation as I-69. The Lufkin District hosted an open house on June 27, 2017 and a public hearing on Dec. 13, 2018. These meetings were held to display schematic layouts, make environmental documentation available for review and gather public input on the proposed project. The Lufkin District used feedback from these meetings to develop and finalize the schematic and environmental studies. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
