US 59 Water & Wastewater Utility Relocations
Sector: Water Supply and Storage • Location: Wharton, Texas, United States of America
Source: Dodge USA
Scope The work includes construction of 5,600' of 12" and 24" waste water effluent, 5,100' of 10"-24" sanitary sewer, 8,300' of 14" force main and 11,500' of 16" waterline, removal and grouting of abandoned utilities and all additional items shown on the construction plans. furnishing all labor, material and equipment and performing all work required for the construction of: US 59 Water & Wastewat
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Wharton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about US 59 Water & Wastewater Utility Relocations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope The work includes construction of 5,600' of 12" and 24" waste water effluent, 5,100' of 10"-24" sanitary sewer, 8,300' of 14" force main and 11,500' of 16" waterline, removal and grouting of abandoned utilities and all additional items shown on the construction plans. furnishing all labor, material and equipment and performing all work required for the construction of: US 59 Water & Wastewater Utility Relocations The project is located in the City of Wharton, Wharton County, Texas. The ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wharton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
