US 60 Blasting Work
Completed · Arizona · Last reported Feb 2025
Source: KTAR News
The US 60 highway between Superior and Miami was closed for blasting work to remove large boulders and debris. This was part of a project to ensure the safety of the roadway after a six-month period of intermittent closures for a bridge replacement project.
- Status
- Closed
- Sector
- Road, Bridge
- Location
- Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- KTAR News
ConstructChat
Ask ConstructChat about US 60 Blasting Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The US 60 highway between Superior and Miami was closed for blasting work to remove large boulders and debris. This was part of a project to ensure the safety of the roadway after a six-month period of intermittent closures for a bridge replacement project. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | KTAR News |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
