logo
ProjectUnder Construction

US 60 Bridge Replacement Project

Under construction · Arizona · Last reported Feb 2025

Source: News Break

The project involves the replacement of the Queen Creek Bridge and Waterfall Canyon Bridge east of Superior, Arizona. The freeway section was closed for an extended period due to blasting operations to remove unstable rock.

Status
Under Construction
Sector
Bridge, Road
Location
Superior, Arizona, United States of America
Updated
22 Jul 2026
Source
News Break

ConstructChat

Ask ConstructChat about US 60 Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “US 60 Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Superior, Arizona, United States. Taiyo aggregates data on it from News Break.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the Queen Creek Bridge and Waterfall Canyon Bridge east of Superior, Arizona. The freeway section was closed for an extended period due to blasting operations to remove unstable rock.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Arizona

City

Superior

Source

Source

News Break

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project