logo

US 63 Improvement Project at Beaver Dam Lake

Sector: Bridge • Location: Cumberland, Wisconsin, United States

Source: DrydenWire.com

Project
Under Construction

This project involves removing the existing box culvert carrying Beaver Dam Lake under US 63 and building a bridge with a longer span to replace it. The profile of US 63 will be raised slightly at the bridge location. The Lake Street Bridge will be removed and not replaced, making Lake Street no longer a through street. The project includes dredging Beaver Dam Lake under US 63 and the Lake Street

Project Information FAQ

Project Information

4 Q
The project “US 63 Improvement Project at Beaver Dam Lake” is an infrastructure initiative in the Bridge sector, located in Cumberland, Wisconsin, United States. Taiyo aggregates data on it from DrydenWire.com.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves removing the existing box culvert carrying Beaver Dam Lake under US 63 and building a bridge with a longer span to replace it. The profile of US 63 will be raised slightly at the bridge location. The Lake Street Bridge will be removed and not replaced, making Lake Street no longer a through street. The project includes dredging Beaver Dam Lake under US 63 and the Lake Street Bridge to allow greater vertical and horizontal clearance for enhanced recreational boat traffic. An ATV trail will be built on the east side of US 63 from Arcade Avenue to Nedvidek Street, including a 10-foot lane for ATVs on the new bridge. US 63 will be reconstructed on both sides of the new bridge, along with portions of Lake Street, Nedvidek Street, and Babcock Avenue to match the raised profile of US 63. Curb, gutter, and sidewalk construction are also part of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data