US 64 Utility Relocation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project includes extending a 12-inch water line down Laura Duncan Road, under US 64, and tie-in to the existing 12- inch water line that runs parallel with US 64. In addition, utility relocations are needed to accommodate US 64 improvements. Existing town utilities within the corridor include 8-inch, 10-inch, and 12-inch water lines, 14-inch force main and 8-10-inch gravity sewers. If the 12-
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Road, Tunnel, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Apex, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about US 64 Utility Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes extending a 12-inch water line down Laura Duncan Road, under US 64, and tie-in to the existing 12- inch water line that runs parallel with US 64. In addition, utility relocations are needed to accommodate US 64 improvements. Existing town utilities within the corridor include 8-inch, 10-inch, and 12-inch water lines, 14-inch force main and 8-10-inch gravity sewers. If the 12-inch water line is not extended across US 64, the town will have flow issues in this area and con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Apex |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Tunnel, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
