logo

US 67 Belt Line Road & FM 1382 Aesthetic Bridge Lighting

Closed · Texas · Last reported Apr 2024

Source: Dodge USA

Project
Closed

Sealed bids for furnishing all necessary materials, machinery, equipment, project supervision, and performing all work required for the construction of the US 67 AT BELT LINE ROAD AND FM 1382 AESTHETIC BRIDGE LIGHTING DESIGN

Status
Closed
Sector
Bridge, Road, Government, Commercial
Location
Cedar Hill, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about US 67 Belt Line Road & FM 1382 Aesthetic Bridge Lighting

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “US 67 Belt Line Road & FM 1382 Aesthetic Bridge Lighting” is an infrastructure initiative in the Bridge sector, located in Cedar Hill, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sealed bids for furnishing all necessary materials, machinery, equipment, project supervision, and performing all work required for the construction of the US 67 AT BELT LINE ROAD AND FM 1382 AESTHETIC BRIDGE LIGHTING DESIGN

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Cedar Hill

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Government, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project