U.S. 67 Bridge Work
Under construction · Illinois · Last reported Mar 2025
Source: KWQC
Work will begin on the bridge carrying U.S. 67 over North Henderson Creek about seven miles south of Viola. Traffic will be reduced to one lane in each direction and directed by temporary traffic signals. The project is expected to last until May 2026.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- KWQC
ConstructChat
Ask ConstructChat about U.S. 67 Bridge Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work will begin on the bridge carrying U.S. 67 over North Henderson Creek about seven miles south of Viola. Traffic will be reduced to one lane in each direction and directed by temporary traffic signals. The project is expected to last until May 2026. |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | KWQC |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
