logo
ProjectUnder Construction

U.S. 67 Bridge Work

Under construction · Illinois · Last reported Mar 2025

Source: KWQC

Work will begin on the bridge carrying U.S. 67 over North Henderson Creek about seven miles south of Viola. Traffic will be reduced to one lane in each direction and directed by temporary traffic signals. The project is expected to last until May 2026.

Status
Under Construction
Sector
Road, Bridge
Location
Illinois, United States of America
Updated
22 Jul 2026
Source
KWQC

ConstructChat

Ask ConstructChat about U.S. 67 Bridge Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “U.S. 67 Bridge Work” is an infrastructure initiative in the Road sector, located in Illinois, United States. Taiyo aggregates data on it from KWQC.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work will begin on the bridge carrying U.S. 67 over North Henderson Creek about seven miles south of Viola. Traffic will be reduced to one lane in each direction and directed by temporary traffic signals. The project is expected to last until May 2026.

Location

Country

United States of America (USA)

State

Illinois

Source

Source

KWQC

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2025-04-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project