logo

US 69 and FM 2493 Grade Separated Interchange Realignment – SH 110

Sector: Bridge • Location: Texas, United States

Source: KLTV

Project
Under Construction

This project consists of the grade-separated interchange and realignment of FM 2493, west of US 69. Construction of drainage structures and driveways is ongoing, with no lane closures expected.

Status
Under Construction
Sector
Bridge, Road, Waste Processing and Treatment, Government
Location
Texas, United States of America
Updated
22 Jul 2026
Source
KLTV

ConstructChat

Ask ConstructChat about US 69 and FM 2493 Grade Separated Interchange Realignment – SH 110

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “US 69 and FM 2493 Grade Separated Interchange Realignment – SH 110” is an infrastructure initiative in the Bridge sector, located in Texas, United States. Taiyo aggregates data on it from KLTV.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the grade-separated interchange and realignment of FM 2493, west of US 69. Construction of drainage structures and driveways is ongoing, with no lane closures expected.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

KLTV

URL

More Details

Record type

Project

Sector

Bridge, Road, Waste Processing and Treatment, Government

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project