logo
ProjectAwarded

US-70 Roosevelt Bridge Replacement

One of 10,000+ projects Taiyo tracks in Oklahoma.

Source: KOKH

Replacement of the US-70 Roosevelt Bridge over Lake Texoma with a unique project contract valued at $408 million. Construction is expected to run from summer 2026 until fall 2029.

Status
Closed
Sector
Bridge
Location
Oklahoma, United States of America
Updated
22 Jul 2026
Source
KOKH

ConstructChat

Ask ConstructChat about US-70 Roosevelt Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “US-70 Roosevelt Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Oklahoma, United States. Taiyo aggregates data on it from KOKH.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the US-70 Roosevelt Bridge over Lake Texoma with a unique project contract valued at $408 million. Construction is expected to run from summer 2026 until fall 2029.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

KOKH

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-04-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project