US 8 (Gatewood Road to N Rifle Road)
Sector: Residential • Location: Rhinelander, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The existing pavement along this segment of US 8 is exhibiting signs of deterioration. Additionally, some culverts were found to be in poor condition. This project involves removing the existing pavement and replacing with a new asphalt surface. Deficient culverts will be cleaned or replaced. A retaining wall east of Wausau Road will receive minor repair work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing pavement along this segment of US 8 is exhibiting signs of deterioration. Additionally, some culverts were found to be in poor condition. This project involves removing the existing pavement and replacing with a new asphalt surface. Deficient culverts will be cleaned or replaced. A retaining wall east of Wausau Road will receive minor repair work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
