US 8 (Lustila Road to Tracy Road)
Sector: Road • Location: Rhinelander, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The project includes performing a cold in place recycling (CIR) of the existing pavement surface and placing an additional two inches of new asphalt over the recycled pavement. Culvert pipes will be replaced in 14 locations. The culvert pipes at Scott Creek will be replaced with a two-cell box culvert.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project includes performing a cold in place recycling (CIR) of the existing pavement surface and placing an additional two inches of new asphalt over the recycled pavement. Culvert pipes will be replaced in 14 locations. The culvert pipes at Scott Creek will be replaced with a two-cell box culvert. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
