logo

US 8 (Peshtigo River Bridge to Marinette County Line)

Sector: Commercial • Location: Armstrong Creek, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

We are proposing to improve 10.8 miles of US 8. Proposed improvements include: Milling the surface layer of existing asphalt and overlaying it with new asphalt.Widening the paved portion of the shoulders from 3 feet to 5 feet through the town of Armstrong Creek.Installing new pavement markings and adding centerline rumble strips.Replacing the epoxy ATV/snowmobile crossing approximately 400 feet ea

Project Information FAQ

Project Information

4 Q
The project “US 8 (Peshtigo River Bridge to Marinette County Line)” is an infrastructure initiative in the Commercial sector, located in Armstrong Creek, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

We are proposing to improve 10.8 miles of US 8. Proposed improvements include: Milling the surface layer of existing asphalt and overlaying it with new asphalt.Widening the paved portion of the shoulders from 3 feet to 5 feet through the town of Armstrong Creek.Installing new pavement markings and adding centerline rumble strips.Replacing the epoxy ATV/snowmobile crossing approximately 400 feet east of WIS 139.Replacing deteriorating culverts throughout the project limits including the large steel pipe under US 8 at Armstrong Creek with a concrete box culvert.Flattening the side slopes and removing the cable guard between Cemetary Road/Chitko Road and County Line Road.Replacing the curb and gutter west of WIS 101 and at the following intersections:WIS 139Ross Lake RoadBrowns RoadNewald Tower RoadZiolkowski RoadDanielczak RoadWIS 101/Old 101 Road (south side only)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data