US 8 (Rusk County Line to Jump River Bridge)
Sector: Road • Location: Catawba, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The project proposes to resurface the asphalt pavement. Other project work includes a box culvert replacement structure, structure concrete deck overlay and concrete approach slab replacement for Jump River Bridge, cross culvert replacements, guardrail replacements at the Jump River structure and reconstruction of six curb ramps in Catawba.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project proposes to resurface the asphalt pavement. Other project work includes a box culvert replacement structure, structure concrete deck overlay and concrete approach slab replacement for Jump River Bridge, cross culvert replacements, guardrail replacements at the Jump River structure and reconstruction of six curb ramps in Catawba. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
