US 80 Waterline Relocation
Sector: Water Supply and Storage • Location: Dallas, Texas, United States of America
Source: Dodge USA
24" & 42" Valve Automation Along Us 80 Between Beltline Road And South Collins Road. This project includes excavation and removal of two existing manual operators on butterfly valves, and the installation of two automated operators, vaults, and electrical appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about US 80 Waterline Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 24" & 42" Valve Automation Along Us 80 Between Beltline Road And South Collins Road. This project includes excavation and removal of two existing manual operators on butterfly valves, and the installation of two automated operators, vaults, and electrical appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
