US 82 Lamar County
Sector: Car parking • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The proposed improvements include the widening of US 82 from a two-lane highway to a four-lane divided highway for a distance of approximately 16 miles. The proposed roadway from the Fannin County line to County Road 23900 west of Toco includes two 12-foot-wide travel lanes in each direction, a 10-foot-wide outside shoulder, and a 68-foot-wide depressed median. From CR 23900 to Loop 286, the roadw
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed improvements include the widening of US 82 from a two-lane highway to a four-lane divided highway for a distance of approximately 16 miles. The proposed roadway from the Fannin County line to County Road 23900 west of Toco includes two 12-foot-wide travel lanes in each direction, a 10-foot-wide outside shoulder, and a 68-foot-wide depressed median. From CR 23900 to Loop 286, the roadway includes two 12-foot-wide travel lanes in each direction, a 10-foot-wide outside shoulder and a 16-foot-wide continuous left turn lane. Within the City of Paris limits, a five-foot-wide sidewalk would be provided on the south side of US 82. The proposed project would, subject to final design considerations, require additional right of way and potential displacements of residential and commercial structures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
