US 84 Bridge Replacement (I-25 Romeroville Interchange)
Sector: Bridge • Location: New Mexico, United States of America
Source: New Mexico Department of Transportation (NMDOT)
The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The current bridge deck surface is in poor condition and does not meet current federal vertical height clearance standards over an interstate highway. The proposed improvements are expected to include roadway reconstruction and rehabilitation, bridge and roadside barrier replacement, signing and striping, dra
- Status
- Prospective
- Sector
- Bridge, Road, Government, Waste Processing and Treatment
- Location
- New Mexico, United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about US 84 Bridge Replacement (I-25 Romeroville Interchange)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The current bridge deck surface is in poor condition and does not meet current federal vertical height clearance standards over an interstate highway. The proposed improvements are expected to include roadway reconstruction and rehabilitation, bridge and roadside barrier replacement, signing and striping, drainage improvements, and existing utilities and lighting relocation, as needed. Temporary crossover locations to divert traffic during construction are anticipated north and south of the interchange on I-25. The design team is considering a roundabout at the west side of the interchange in front of the Speedway travel stop to facilitate bridge construction and to provide adequate spacing between interchange ramps and frontage roads. Public and stakeholder meetings will be scheduled this summer to solicit input on this proposed roundabout. |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
