US 84 Bridge Replacement (I-25 Romeroville Interchange)
Sector: Road • Location: United States
Source: New Mexico Department of Transportation (NMDOT)
CN 4101530 District 4 San Miguel County
The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The existing bridge does not meet current federal vertical height clearance standards over an interstate highway and the bridge deck surface is in poor condition. Other proposed improvements will include roadway reconstruction and rehabilitation, bridge and roadside ba
- Status
- Prospective
- Sector
- Road, Bridge
- Location
- United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about US 84 Bridge Replacement (I-25 Romeroville Interchange)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | CN 4101530 District 4 San Miguel County The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The existing bridge does not meet current federal vertical height clearance standards over an interstate highway and the bridge deck surface is in poor condition. Other proposed improvements will include roadway reconstruction and rehabilitation, bridge and roadside barrier replacement, signing and striping, drainage improvements, and lighting relocations. Aesthetic treatments for the new bridge are proposed and additional public and stakeholder input will be sought for this effort. Temporary crossover locations to divert traffic during construction are anticipated north and south of the interchange on I-25. The design team considered a roundabout at the west side of the interchange in front of the Speedway travel stop to provide adequate spacing between interchange ramps and frontage roads. However, most public and stakeholder input did not favor a roundabout. As a result, ongoing design efforts will not include a roundabout. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2026-11-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
