logo
ProjectStudy And Design

US 84 Bridge Replacement (I-25 Romeroville Interchange)

Sector: Road • Location: United States

Source: New Mexico Department of Transportation (NMDOT)

CN 4101530 District 4 San Miguel County

The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The existing bridge does not meet current federal vertical height clearance standards over an interstate highway and the bridge deck surface is in poor condition. Other proposed improvements will include roadway reconstruction and rehabilitation, bridge and roadside ba

Status
Prospective
Sector
Road, Bridge
Location
United States of America
Updated
19 Nov 2026
Source
New Mexico Department of Transportation (NMDOT)

ConstructChat

Ask ConstructChat about US 84 Bridge Replacement (I-25 Romeroville Interchange)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “US 84 Bridge Replacement (I-25 Romeroville Interchange)” is an infrastructure initiative in the Road sector, located in United States. Taiyo aggregates data on it from New Mexico Department of Transportation (NMDOT).

Participants

Not available for this record.

Status

Original status

study and design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

CN 4101530 District 4 San Miguel County The project involves replacing the bridge at the I-25 Romeroville Interchange (Exit 339). The existing bridge does not meet current federal vertical height clearance standards over an interstate highway and the bridge deck surface is in poor condition. Other proposed improvements will include roadway reconstruction and rehabilitation, bridge and roadside barrier replacement, signing and striping, drainage improvements, and lighting relocations. Aesthetic treatments for the new bridge are proposed and additional public and stakeholder input will be sought for this effort. Temporary crossover locations to divert traffic during construction are anticipated north and south of the interchange on I-25. The design team considered a roundabout at the west side of the interchange in front of the Speedway travel stop to provide adequate spacing between interchange ramps and frontage roads. However, most public and stakeholder input did not favor a roundabout. As a result, ongoing design efforts will not include a roundabout.

Original sector

Transportation

Location

Country

United States of America (USA)

Source

Source

New Mexico Department of Transportation (NMDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2026-11-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project