US 84/285 and Paseo de Onate Intersection Improvements
Sector: Road • Location: United States
Source: New Mexico Department of Transportation (NMDOT)
Control Number: 5100043 District: 5 County: Rio Arriba
The intent of the project is to realign the intersection of US 84/285 and Paseo de Onate to include signalization, lighting, drainage, curb and gutter, sidewalk, signing, and striping improvements.
- Status
- Prospective
- Sector
- Road, Car parking, Automotive
- Location
- United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about US 84/285 and Paseo de Onate Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Control Number: 5100043 District: 5 County: Rio Arriba The intent of the project is to realign the intersection of US 84/285 and Paseo de Onate to include signalization, lighting, drainage, curb and gutter, sidewalk, signing, and striping improvements. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive |
Article published date | 2026-11-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
