US-89 from South Willard to Perry
One of 10,000+ projects Taiyo tracks in Utah.
Source: Utah Department of Transportation (UDOT)
UDOT is evaluating design improvements along US-89 from SR-126 in South Willard to 3600 South in Perry. The US-89 subgrade material (e.g., compacted gravel) in this area has reached its operational expectancy and become unstable. Roads with an unstable subgrade result in quicker pavement deterioration and require frequent pavement repairs. Additionally, much of the existing surface drainage along
- Status
- Prospective
- Sector
- Road, Waste Processing and Treatment, Government
- Location
- Perry, Utah, United States of America
- Updated
- 19 Nov 2026
- Source
- Utah Department of Transportation (UDOT)
ConstructChat
Ask ConstructChat about US-89 from South Willard to Perry
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | studies |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | UDOT is evaluating design improvements along US-89 from SR-126 in South Willard to 3600 South in Perry. The US-89 subgrade material (e.g., compacted gravel) in this area has reached its operational expectancy and become unstable. Roads with an unstable subgrade result in quicker pavement deterioration and require frequent pavement repairs. Additionally, much of the existing surface drainage along this section of US-89 is uncontained resulting in ponding and roadway storm runoff (i.e., sheet flow) during stormy weather. |
Location
Country | United States of America (USA) |
State | Utah |
City | Perry |
Source
Source | Utah Department of Transportation (UDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Government |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
