US 90 Resurfacing Project
Sector: Road • Location: Quincy, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
This US 90 project will resurface all existing travel lanes, auxiliary lanes, median crossovers, paved shoulders, extending the eastbound and westbound left-turn lanes at Ben Bostick Road, and extending the southbound right-turn lane onto Ben Bostick Road.Additional features include:Safety improvements at U.S. 90 and State Road (S.R.) 12 (Greensboro Highway) intersection:Creating dedicated through
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This US 90 project will resurface all existing travel lanes, auxiliary lanes, median crossovers, paved shoulders, extending the eastbound and westbound left-turn lanes at Ben Bostick Road, and extending the southbound right-turn lane onto Ben Bostick Road.Additional features include:Safety improvements at U.S. 90 and State Road (S.R.) 12 (Greensboro Highway) intersection:Creating dedicated through lanes in the eastbound direction by eliminating the merge.Extending the westbound left-turn lane from U.S. 90 onto Greensboro Highway.Safety improvements at Ben Bostick Road intersection:Adding a traffic light at the U.S. 90 intersection.Adding a right-turn lane from Ben Bostick Road onto U.S. 90.Safety improvement at Barack Obama Boulevard intersection:Creating a right-in/right-out access to U.S. 90.Safety improvements at S.R. 267 (Pat Thomas Parkway) by shifting left-turn lanes on either side to improve line of sight.Upgrading pedestrian features to meet current Americans with Disabilities Act (ADA) standards and minor drainage improvements.No additional right-of-way will be required. Bids for construction are scheduled to occur winter 2024. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
