U.S. 90 (State Road 10) Resurfacing from Greenville to Southwest Captain Brown Road
Sector: Automotive • Location: Greenville, Madison, Florida, United States of America
Source: Florida Department of Transportation (FDOT)
The Florida Department of Transportation (FDOT) is scheduled to resurface U.S. 90 (State Road 10) from Greenville to Southwest Captain Brown Road. The project consists of milling and resurfacing, removing, and replacing the upper layers of asphalt, asphalt grade adjustments, drainage improvements and rehabilitation, new highway signing and pavement markings, and other incidental construction items
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Florida Department of Transportation (FDOT) is scheduled to resurface U.S. 90 (State Road 10) from Greenville to Southwest Captain Brown Road. The project consists of milling and resurfacing, removing, and replacing the upper layers of asphalt, asphalt grade adjustments, drainage improvements and rehabilitation, new highway signing and pavement markings, and other incidental construction items. Traffic will be maintained in accordance with FDOT plans and design standards throughout the project. Drivers can expect daytime lane closures from 8:30 a.m. to 5 p.m. Monday through Friday. No lane closures will be allowed between the hours of 6:30 a.m. to 8:30 a.m. Monday through Friday. During construction, the posted speed limit is expected to be lowered for the safety of vehicles and construction crews. FDOT selected Anderson Columbia Inc. to complete this project by the estimated completion date, weather and unforeseen circumstances permitting. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
