logo

U.S. 90 (State Road 10) Resurfacing from Greenville to Southwest Captain Brown Road

Sector: Automotive • Location: Greenville, Madison, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

The Florida Department of Transportation (FDOT) is scheduled to resurface U.S. 90 (State Road 10) from Greenville to Southwest Captain Brown Road. The project consists of milling and resurfacing, removing, and replacing the upper layers of asphalt, asphalt grade adjustments, drainage improvements and rehabilitation, new highway signing and pavement markings, and other incidental construction items

Project Information FAQ

Project Information

5 Q
The project “U.S. 90 (State Road 10) Resurfacing from Greenville to Southwest Captain Brown Road” is an infrastructure initiative in the Automotive sector, located in Greenville, Madison, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation (FDOT) is scheduled to resurface U.S. 90 (State Road 10) from Greenville to Southwest Captain Brown Road. The project consists of milling and resurfacing, removing, and replacing the upper layers of asphalt, asphalt grade adjustments, drainage improvements and rehabilitation, new highway signing and pavement markings, and other incidental construction items. Traffic will be maintained in accordance with FDOT plans and design standards throughout the project. Drivers can expect daytime lane closures from 8:30 a.m. to 5 p.m. Monday through Friday. No lane closures will be allowed between the hours of 6:30 a.m. to 8:30 a.m. Monday through Friday. During construction, the posted speed limit is expected to be lowered for the safety of vehicles and construction crews. FDOT selected Anderson Columbia Inc. to complete this project by the estimated completion date, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data