logo

US 98 Widening and Realignment from Polk County line to US 301

Sector: Bridge • Location: Dade City, Florida, United States of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Ongoing

The design-build project will widen US 98 creating a 4-lane divided roadway from the Polk County line to north of Townsend Road and realign US 98 from north of Townsend Road to US 301. The realignment allows US 98 to align with Clinton Avenue, which became the new SR 52 at the intersection of US 301 in February 2023. Four new roundabouts will be built, including one at the new intersection of US 9

Project Information FAQ

Project Information

5 Q
The project “US 98 Widening and Realignment from Polk County line to US 301” is an infrastructure initiative in the Bridge sector, located in Dade City, Florida, United States of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The design-build project will widen US 98 creating a 4-lane divided roadway from the Polk County line to north of Townsend Road and realign US 98 from north of Townsend Road to US 301. The realignment allows US 98 to align with Clinton Avenue, which became the new SR 52 at the intersection of US 301 in February 2023. Four new roundabouts will be built, including one at the new intersection of US 98 and Clinton Avenue east of US 301. There will also be 3 new signalized intersections. The existing bridge over CSX Railroad and old Lakeland Highway will be replaced with twin bridges. There will be a 6-foot sidewalk on the east side of the road and a 10-foot wide shared use path on the west side of the road that will connect to the Withlacoochee State Trail on US 301. The contractor is responsible for finalizing the design plans and building the improvements. The design portion of the contract is nearing completion. Construction officially began with clearing activities on February 12, 2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data