logo

US 98 widening from Mack Bayou Road to CR 30A West

Sector: Road • Location: Destin, Miramar Beach, Miramar Beach, Florida, United States Of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Construction

FDOT is constructing $15.7 million project to widen and improve 1.8 miles of U.S. 98, between Mack Bayou Road and CR 30A in Walton County. This project includes widening US 98 from four to six travel lanes to include new bicycle lanes on both sides of the roadway, constructing new five-to-six-foot sidewalks on the north side of US 98, and constructing a 10-foot-wide shared use path on the south s

Project Information FAQ

Project Information

4 Q
The project “US 98 widening from Mack Bayou Road to CR 30A West” is an infrastructure initiative in the Road sector, located in Destin, Miramar Beach, Miramar Beach, Florida, United States Of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

FDOT is constructing $15.7 million project to widen and improve 1.8 miles of U.S. 98, between Mack Bayou Road and CR 30A in Walton County. This project includes widening US 98 from four to six travel lanes to include new bicycle lanes on both sides of the roadway, constructing new five-to-six-foot sidewalks on the north side of US 98, and constructing a 10-foot-wide shared use path on the south side of the roadway. Other Improvements Include: Upgrading pedestrian crossings at the three signalized intersections to comply with Americans with Disabilities Act (ADA) requirements. Drainage improvements. Signalization improvements at Mack Bayou Road, Hewett Road, and CR 30A intersections. Milling and resurfacing the pavement throughout the project limits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data