logo
ProjectClosed

US Customs Renovation Phase II

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Phase two will include interior demolition as required to make spaces for a new Interview Room, Holding Room and Search Room, along revise Bag Search Room. With expansion of all the security systems installed in Phase One. General build-back of new rooms will include new walls and ceilings, paint and base, and floor covering, all required lighting, power &data, A/C grilles & registers, required se

Status
Closed
Sector
Airport, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Sugar Land, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about US Customs Renovation Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “US Customs Renovation Phase II” is an infrastructure initiative in the Airport sector, located in Sugar Land, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase two will include interior demolition as required to make spaces for a new Interview Room, Holding Room and Search Room, along revise Bag Search Room. With expansion of all the security systems installed in Phase One. General build-back of new rooms will include new walls and ceilings, paint and base, and floor covering, all required lighting, power &data, A/C grilles & registers, required security devices, doors, hardware and required furniture. Ceilings in the three new spaces shall be...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Sugar Land

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project