US Enrichment Plant Expansion at Urenco USA
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Nuclear Engineering International
Urenco USA has begun production of enriched uranium in its newest gas centrifuge cascade as part of an expansion project at its enrichment facility in New Mexico. The expansion will add 700,000 SWU to the plant's capacity, representing a 15% increase in US enrichment capacity, with several cascades planned to come online by early 2027.
- Status
- Under Construction
- Sector
- Commercial, Nuclear
- Location
- Eunice, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Nuclear Engineering International
ConstructChat
Ask ConstructChat about US Enrichment Plant Expansion at Urenco USA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Urenco USA has begun production of enriched uranium in its newest gas centrifuge cascade as part of an expansion project at its enrichment facility in New Mexico. The expansion will add 700,000 SWU to the plant's capacity, representing a 15% increase in US enrichment capacity, with several cascades planned to come online by early 2027. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Eunice |
Source
Source | Nuclear Engineering International |
URL |
More Details
Record type | Project |
Sector | Commercial, Nuclear |
Article published date | 2025-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in USA
- Widen Turnpike Minneola Interchange to US 27
- Central Florida WrongWay Detection Technology Implementation Project
- Widen Sawgrass from North of Oakland Park Blvd to South of Atlantic Blvd
- Queue Warning Installation Project Systemwide
- Sand Lake Interchange
- Treasure Coast Turnpike Mainline Widening Projects
- Central Polk Parkway US 17 to SR 60
- Widen Sawgrass Expressway from North of Atlantic Blvd to North of Sample Rd
